Huge Bracket For McNary Dam. Machining Giant Bracket -- A 41-foot bearing bracket of 70,000 kilowatt hydraulic turbine-driven generator for McNary Dam is shown on a 42-foot boring mill in the General Electric Co. plant at Schenectady. Workmen on top of the bracket are dwarfed by its size.
Digital Commonwealth — Boston Public Library

Huge Bracket For McNary Dam. Machining Giant Bracket -- A 41-foot bearing bracket of 70,000 kilowatt hydraulic turbine-driven generator for McNary Dam is shown on a 42-foot boring mill in the General Electric Co. plant at Schenectady. Workmen on top of the bracket are dwarfed by its size.

General Electric Company · [ca. December 1954]

CC0 — Public Domain
Digital Commonwealth — Boston Public Library

[Information from item housing] General Electric Company

🔒
Order museum-quality prints

Sign in to order prints, canvas, and more of this work. Browsing and full-resolution downloads stay free.