Bridge Repair Sequence Following 1955 Floods: 1. (Upper left)- Pouring pre-stressed concrete beams at concrete plant in Needham. 2. (Upper right)- Placing beams in position at washed-out bridge. 3. (Lower left)- Black top surfacing goes over concrete slab supports. 4. (Lower right)- Completed bridge after work by state public works depart.
Digital Commonwealth — Boston Public Library

Bridge Repair Sequence Following 1955 Floods: 1. (Upper left)- Pouring pre-stressed concrete beams at concrete plant in Needham. 2. (Upper right)- Placing beams in position at washed-out bridge. 3. (Lower left)- Black top surfacing goes over concrete slab supports. 4. (Lower right)- Completed bridge after work by state public works depart.

[ca. August 1956]

CC0 — Public Domain
Digital Commonwealth — Boston Public Library

[Information from item housing] Floods: Aug. 1955: Misc. Photos

🔒