
[ca. 1930–1945]
Approach to the Sagamore Bridge, Cape Cod, Mass. This magnificent structure was completed 1935 at an approximate cost of $1,500,000. Length 1833 ft., central span 135 ft. above high water, width of arch 500 ft., maximum height of steel work above sea level 270 ft.
Sign in to order prints, canvas, and more of this work. Browsing and full-resolution downloads stay free.